Pipeline Construction

Concrete Line

Large Mining Company  |  Belle Plaine, Saskatchewan  |  2015

SCOPE OF WORK: Pipeline Replacement, 3 x 20” and 2 x 24”.

CHALLENGES/UNIQUENESS: Ditch was massive and required using a John Deere 670-6-yard bucket track hoe, 2 support CAT 349s and an additional 3 CAT 336s piloting. A&B’s Fabrication Team designed and built 4-40 foot boom sticks specifically for this project.

TIME TO COMPLETE: 4 months

SUPPORTING DIVISIONS: Fabrication